Agenda item

6 The Grove, Epsom KT17 4DQ - Planning Application 18/00647/FUL

Proposed two storey extension, 1st floor side extension and conversion of existing dwelling to provide 2 x 2 bed flats and 1 x 1 bed flat, including parking and landscaping.

Minutes:

Description

Proposed two storey rear extension, 1st floor side extension and conversion of existing dwelling to provide 4 x two bed  flat and 1 x one bed flat, including parking and landscaping.

Decision

Planning permission is PERMITTED subject to the following conditions:

Conditions:

(1)            The development hereby permitted shall be commenced within 3 years from the date of this decision.

Reason: In order to comply with Section 91 of the Town and Country Planning Act, 1990.  (As amended)

(2)            The development hereby permitted shall be carried out in accordance with the following approved plans:

20160-126-01  Rev A Existing Plans -27/05/2016

18/022/02 Rev A Proposed Elevation - May 2018

18/022/01 Rev C Proposed Site Layout Plan - Nov 2018

18/022/03 Rev 0  Proposed Floor Plans - June 2018

18/022/04 Rev 0 Proposed Attic Flat - July 2018

Reason: For avoidance of doubt and in the interests of proper planning to comply with Policy CS5 of the Core Strategy (2007)

(3)            The materials and finishes of the external walls and roof of the development hereby permitted shall match in colour and texture to those of the existing building and shall thereafter be retained as such.

Reason: To ensure a satisfactory appearance on completion of the development in accordance with Policy DM10 (Design Requirements for New Developments including House Extensions) of the Development Management Policies  2015.

(4)            Works related to the construction of the development hereby permitted, including works of demolition or preparation prior to building operations shall not take place other than between the hours of 08.00 to 18.00 hours Mondays to Fridays; 08.00 to 13.00 hours Saturdays; with no work on Saturday afternoons (after 13.00 hours), Sundays, Bank Holidays or Public Holidays.

Reason: In order to safeguard the amenities of the occupiers of neighbouring properties in accordance with Policy DM10 of the Development Management Policies 2015.

(5)            The rooflight window(s) hereby approved shall be of a 'conservation style' and shall not project beyond the plane of the roof.

Reason: To safeguard the special architectural and historic interest of the character and appearance of the conservation area  in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM8, DM9 and DM10 of the Development Management Policies 2015.

(6)            A landscape management plan covering a period of no less than 5 years, including long term design objectives, management responsibilities, maintenance and inspection schedules for all landscape areas shall be submitted to and approved in writing by the local planning authority  prior to the occupation of the development or any completed phase of the development, whichever is the sooner. Any trees or plants which, within a period of five years after planting, are removed, die or in the opinion of the local planning authority become seriously damaged or diseased, shall be replaced in the next available planting season with others of similar size, species and number, unless otherwise agreed in writing by the local planning authority.

Reason: To ensure that due regard is paid to the continuing enhancement and maintenance of amenity afforded by landscape features in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(7)            No development shall take place until details of all new or replacement external chimneys, flues, extract ducts, vents, grilles and meter housings  have been submitted to and approved in writing by the local planning authority. The works shall be carried out in accordance with the approved details.    All new external flues, pipework and grilles shall be cast metal and finished in appropriate materials.

Reason:  In the interest of the character and appearance of the Church Street Conservation Area in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM8, DM9 and DM10 of the Development Management Policies 2015.

(8)            No development shall take place until an Arboricultural Method Statement (detailing all aspects of construction and staging of works) and a Tree Protection Plan in accordance with British Standard 5837:2012 (or later revision) has been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the agreed details and no equipment, machinery or materials shall be brought onto the site for the purposes of the development until fencing has been erected in accordance with the Tree Protection Plan.  Within any area fenced in accordance with this condition, nothing shall be stored, placed or disposed of above or below ground, the ground level shall not be altered, no excavations shall be made, nor shall any fires be lit, without the prior written consent of the local planning authority. The fencing shall be maintained in accordance with the approved details, until all equipment, machinery and surplus materials have been moved from the site.

Reason: To protect the trees on site which are to be retained in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(9)            No demolition, site clearance or building operations shall commence on site until the protective fencing and other protection measures as shown on the Arboricultural Method Statement have been installed. At all times until the completion of the development, such fencing and protection measures shall be retained as approved. Within all fenced areas, soil levels shall remain unaltered and the land kept free of vehicles, plant, materials and debris.

Reason: To protect the trees on site which are to be retained in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(10)        No equipment, machinery or materials shall be brought onto the site for the purpose of the development, until a scheme showing the exact position of protective fencing to enclose all retained trees as shown on the submitted plans, beyond the outer edge of the overhang of their branches in accordance with British Standard 5837: 2012 - Trees in Relation to Construction (or later revision), has been submitted to and approved in writing by the local planning authority, and the protective fencing has been erected in accordance with the approved details. This fencing shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the prior written consent of the local planning authority.

Reason: To protect the trees on site which are to be retained in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(11)        Before any occupation of the development hereby permitted, the window at first floor level on the southern side elevation shall be constructed so that no part of the framework less than 1.7m above finished floor level shall be openable. Any part below that level shall be fitted with, and retained in, obscure glazing of a patterned type only which shall thereafter be retained as such. Obscure glazed windows should be obscured to minimum of level 3 of the Pilkington Scale. The use of any type of film or material affixed to clear glass is not acceptable for the purposes of this Condition.

Reason: To protect the amenities and privacy of the adjoining residential properties in accordance with Policy DM10 (Design Requirements for New Developments including House Extensions) of the Development Management Policies 2015.

(12)        The car parking accommodation shown upon the approved drawings shall be provided with a permeable, hard bound, dust free surface, adequately drained before the development to which it relates is occupied and thereafter it shall be kept free from obstruction at all times for use by the occupier of the development and shall not thereafter be used for any purposes other than the parking of vehicles for the occupiers of the development and visitors to it.  The car parkingmaterial shall be York Stone or Grasdscrete with full details of the material submitted  to the Local Planning Authority and approved in writing prior to the occupation of the development and thereafter maintained in perpetuity.

Reason: To ensure the provision of adequate off-street parking accommodation and to avoid the congestion of surrounding roads by parked vehicles in accordance with Policy DM10 (Design Requirements for New Developments including House Extensions) of the Development Management Policies 2015.

(13)        The development herby approved shall be carried out in accordance with the protection, mitigation and enhancement measures detailed in the ecological assessment with the plan of implementation details to be submitted to the Local Planning Authority and agreed in writing prior to the commencement of the development.  The approved measures shall thereafter be maintained in perpetuity.

Reason: To preserve and enhance biodiversity and habitats in accordance with Policy CS3 of the Core Strategy (2007) and Policy DM4 of the Development Management Policies 2015.

(14)        No development shall take place until full details, of both hard and soft landscape proposals, including a schedule of landscape maintenance for a minimum period of 5 years, have been submitted to and approved in writing by the local planning authority. The approved landscape scheme (with the exception of planting, seeding and turfing) shall be implemented prior to the occupation of the development hereby approved and thereafter retained.

Reason: To ensure the provision, establishment and maintenance of an appropriate landscape scheme in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(15)        No development shall take place until an Environmental Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority.

Reason:  In order that the development should not prejudice highway safety nor cause inconvenience to other highway users in accordance with Policy CS16 of the Core Strategy (2007).

(16)        Prior to the installation of any security lights, the full details of the lights including location, manufacturer details, hours of use and luminance, shall be submitted to and approved in writing by the Local Planning Authority.  The security lights shall be downward facing in perpetuity.

Reason:  To ensure that the lights do not prejudice the enjoyment by neighbouring occupiers of their properties and to ensure that the lights do not affect the local wildlife including badgers, in accordance with Policy DM10 of the Development Management Policies 2015.

Informatives:

(1)            In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way.  We have made available detailed advice in the form or our statutory policies in the Core Strategy, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.

(2)            Your attention is drawn to the need to comply with the relevant provisions of the Building Regulations, the Building Acts and other related legislation.  These cover such works as  - the demolition of existing buildings, the erection of a new building or structure, the extension or alteration to a building, change of use of buildings, installation of services, underpinning works, and fire safety/means of escape works.  Notice of intention to demolish existing buildings must be given to the Council's Building Control Service at least 6 weeks before work starts.  A completed application form together with detailed plans must be submitted for approval before any building work is commenced.

If you need any advice regarding Building Regulations please do not hesitate to contact Epsom & Ewell Borough Council Building Control on 01372 732000 or contactus@epsom-ewell.gov.uk.

(3)            No part of the development including foundations or guttering, shall encroach upon the adjoining property.

(4)            The Party Wall Act 1996 requires a building owner to notify, and obtain formal agreement from, any adjoining owner, where the building owner proposes to:

o        carry out work to an existing party wall;

o        build on the boundary with a neighbouring property;

o        in some circumstances, carry out groundwork's within 6 metres of an adjoining building.

Notification and agreements under this Act are the responsibility of the building owner and are quite separate from Building Regulations, or Planning Controls.  The Building Control Service will assume that an applicant has obtained any necessary agreements with the adjoining owner, and nothing said or implied by the Council should be taken as removing the necessity for the building owner to comply fully with the Party Wall Act. Further information and advice is to be found in "The Party Walls etc. Act 1996 - Explanatory Booklet".

(5)            The permission hereby granted shall not be construed as authority to carry out any works on the highway or any works that may affect a drainage channel/culvert or water course.  The applicant is advised that a permit and, potentially, a Section 278 agreement must be obtained from the Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway. All works on the highway will require a permit and an application will need to submitted to the County Council's Street Works Team up to 3 months in advance of the intended start date, depending on the scale of the works proposed and the classification of the road. Please see  http://www.surreycc.gov.uk/roads-and-transport/road-permits-and-licences/the-traffic-management-permit-scheme. The applicant is also advised that consent may be required under Section 23 of the Land Drainage Act 1991.  Please see www.surreycc.gov.uk/people-and-community/emergency-planning-and-community-safety/flooding-advice

(6)            This form of development is considered liable for the Community Infrastructure Levy (CIL). CIL is a non-negotiable charge on new developments which involve the creation of 100 square metres or more of gross internal floorspace or involve the creation of a new dwelling, even when this is below 100 square metres. The levy is a standardised, non-negotiable charge expressed as pounds per square metre, and are charged on the net additional floorspace generated by a development.

You will receive more information regarding the CIL in due course.

More information and the charging schedule are available online https://www.epsom-ewell.gov.uk/residents/planning/planning-advice/community-infrastructure-levy-cil-guidance

(7)            Please note that information for Condition 13 should include information about how the badger area will be protected and undisturbed through the build phase and the occupation of the development.

The Committee noted verbal representations from two objectors.  Letters of representation had been published on the Council’s website and were available to the public and members of the Committee in advance of the meeting.

Supporting documents: