Agenda item

Lidl UK, 40 - 52 Upper High Street, Epsom, KT17 4RA - 18/01559/REM

Variation of condition 2 (Plans) of application ref: 17/00001/FUL (Proposed Mixed Use Development comprising food retail store (Use Class A1) together with 30 Residential Apartments, Access, Parking, Servicing and Landscaping (as amended)) approved 06/03/2018, to allow for alterations to the elevations

Minutes:

Description

Variation of Condition 2 (Plans) and Condition 7 (Car Parking) of application ref: 17/00001/FUL (Proposed Mixed Use Development comprising food retail store (Use Class A1) together with 30 Residential Apartments, Access, Parking, Servicing and Landscaping (as amended)) approved 06/03/2018, to allow for alterations to the elevations

Decision

Variations to conditions 2 and 7 PERMITTED, subject to the following:

Conditions:

(1)            The development hereby permitted shall be begun before the expiration of three years from the date of the original permission 17/00001/FUL (05.03.2018).

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

(2)            The development hereby permitted shall be carried out in accordance with the following approved plans and documents:

00-XX-DR-A-90-0001 – Existing Site Plan

00-XX-DR-A-91-0001 Rev. P1 – Site Plan

00-03-DR-A-40-0004 Rev. P1- Proposed Ground Floor

00-03-DR-A-40-0005 Rev. P1 - Proposed First Floor Plan

00-03-DR-A-40-0007 Rev. P1 - Proposed Second Floor Plan

00-03-DR-A-40-0011 Rev. P1 - Proposed Third Floor plan

00-RF-DR-A-01-0001 Rev. P1 - General Arrangement plan – Roof

00-XX-DR-A-03-0001 - General Arrangement Sections - Sheet 1

00-XX-DR-A-03-0002 - General Arrangement Sections - Sheet 2

00-03-DR-A-40-0012 - Proposed Elevations – Sheet 1

00-03-DR-A-40-0013 - Proposed Elevations – Sheet 2

3D Views down High Street (East and West)

Reason: For the avoidance of doubt and to ensure that the development is carried out in accordance with the approved plans to comply with Policy CS5 of the Core Strategy (2007). 

(3)            Prior to the commencement of development, details and samples of the external materials to be used for the development shall be submitted to and approved in writing by the local planning authority.  The development shall be carried out in accordance with the approved details.

Reason: To secure a satisfactory appearance in the interests of the visual amenities and character of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM9 and DM10 of the Development Management Policies 2015.

(4)            No development shall take place until full details, of both hard and soft landscape proposals, including a schedule of landscape maintenance for a minimum period of 5 years, have been submitted to and approved in writing by the local planning authority. The approved landscape scheme (with the exception of planting, seeding and turfing) shall be implemented prior to the occupation of the development hereby approved and thereafter retained.

Reason: To ensure the provision, establishment and maintenance of an appropriate landscape scheme in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015

(5)            The development hereby approved shall not be commenced unless and until the proposed vehicular access to Upper High Street has been constructed and provided with visibility zones in accordance with the approved plans and thereafter the visibility zones shall be kept permanently clear of any obstruction measured from 0.6m above the road surface.

Reason: To ensure that the development does not prejudice highway safety or cause inconvenience to other highway users in accordance with Policy CS16 of the Core Strategy (2007) and Policies DM35 and DM37 of the Development Management Policies 2015.

(6)            The development hereby approved shall not be first occupied or first opened for trading unless and until the existing redundant accesses from the site to Upper High Street have been permanently closed and any kerbs, verge, footway, fully reinstated.

Reason: To ensure that the development does not prejudice highway safety or cause inconvenience to other highway users in accordance with Policy CS16 of the Core Strategy (2007) and Policies DM35 and DM37 of the Development Management Policies 2015.

(7)            The development hereby approved shall not be first occupied or first opened for trading unless and until space has been laid out within the site in accordance with the approved plans for and 24 customer cycles and 34 residential cycles to be parked and for the loading and unloading of 1 vehicle and for vehicles to turn so that they may enter and leave the site in forward gear. Thereafter the parking / loading and unloading / turning areas shall be retained and maintained for their designated purposes. 85 retail customer vehicle spaces and 24 residential vehicle spaces

Reason: To ensure that the development does not prejudice highway safety or cause inconvenience to other highway users in accordance with Policy CS16 of the Core Strategy (2007) and Policies DM35 and DM37 of the Development Management Policies 2015.

(8)            Prior to the commencement of the development a Travel Plan shall be submitted for the written approval of the Local Planning Authority in accordance with the sustainable development aims and objectives of the National Planning Policy Framework, Surrey County Council’s “Travel Plans Good Practice Guide”, and in general accordance with the 'Heads of Travel Plan' document. The approved Travel Plan shall be implemented on first occupation and for each and every subsequent occupation of the development, thereafter maintain and develop the Travel Plan to the satisfaction of the Local Planning Authority.

Reason: To encourage travel by means other than private motor vehicles in accordance with Policy CS16 of the Core Strategy (2007) and Policy DM36 of the Development Management Policies 2015.

(9)            No development shall commence until a Construction Transport Management Plan, to

include details of :

(a) parking for vehicles of site personnel, operatives and visitors

(b) loading and unloading of plant and materials

(c) storage of plant and materials

(d) programme of works (including measures for traffic management)

(e) provision of boundary hoarding behind any visibility zones

(f) HGV deliveries and hours of operation

(g) vehicle routing

(h) measures to prevent the deposit of materials on the highway

(i) before and after construction condition surveys of the highway and a commitment to fund the repair of any damage caused

(j) no HGV movements to or from the site shall take place between the hours of 8.00 and 9.15 am nor shall the contractor permit any HGVs associated with the development at the site to be laid up, waiting, in Church Road (North and South) Alexandra Road, Mill Road during these times

(k) on-site turning for construction vehicles has been submitted to and approved in writing by the Local Planning Authority.

Only the approved details shall be implemented during the construction of the development.

Reason: To ensure that the development does not prejudice highway safety or cause inconvenience to other highway users in accordance with Policy CS16 of the Core Strategy (2007) and Policy DM35 of the Development Management Policies 2015.

(10)        The residential units hereby approved shall not be occupied until it has achieved a water efficiency standard using not more than 110 litres per person per day maximum indoor water consumption.

Reason: To ensure that the development is sustainable and makes efficient use of water to comply with Policy DM12 of the Development Management Policies 2015.      

(11)        Before the development hereby permitted commences and in addition to any assessment provided with the application, a ground contamination investigation and risk assessment must be completed. The scope and detail of these are subject to the approval in writing by the local planning authority. The investigation and risk assessment must be undertaken by suitably qualified and accredited persons and a written report of the findings must be produced. The final written report is subject to the approval in writing of the local planning authority. The report of the findings must include:

(i) details of the extent, scale and nature of contamination

(ii) an assessment of the potential risks to:

human health

property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes

adjoining land and occupants

groundwaters and surface waters

ecological systems

archaeological sites and ancient monuments

(iii)  details of viable remedial options, and identification of and justification for the preferred option(s).

This must be conducted in accordance with Defra and the Environment Agency's Model Procedures for the Management of Land Contamination, CLR 11.

(12)        The development must be carried out in complete accordance with the approved written report.  If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the local planning authority in writing until appropriate remediation has been undertaken.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with Policy DM17 of the Development Management Policies 2015 and the National Planning Policy Framework.

(13)        A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared by suitably qualified and accredited  persons, and shall be submitted to and approved in writing by the local planning authority. 

The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that, after remediation, as a minimum, the site should not be capable of being determined as contaminated land under Part 2A of the Environmental Protection Act 1990.

The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the local planning authority. The local planning authority must be given two weeks written notification of commencement of the remediation scheme works.

(14)        Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be prepared by suitably qualified and accredited persons and submitted to the local planning authority for written approval.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, Policy DM17 of Development Management Policies 2015.

(15)        In the event that unexpected contamination is found at any time when carrying out the approved development it must be reported in writing to the local planning authority immediately.  An investigation and risk assessment must be undertaken and where remediation is necessary a remediation scheme must be prepared and approved in writing by the local planning authority. Development must accord with the approved details.  Following completion of the remediation works, a verification report must be prepared by suitably qualified and accredited persons and submitted to the local planning authority for written approval.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, Policy DM17 of the Development Management Policies 2015.

(16)        A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation and the provision of reports on the same must be prepared by suitably qualified and accredited persons, both of which are subject to the local planning authority’s written approval.  Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced by suitably qualified and accredited persons and submitted to the local planning authority.  This must be conducted in accordance with Defra and the Environment Agency's Model Procedures for the Management of land Contamination, CLR 11.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with Policy DM17 of the Development Management Policies 2015.

(17)        A Certificate of Completion shall be prepared by suitably qualified and accredited  persons and provided to the local planning authority before occupation of any part of the site by any end user, stating that remediation has been carried out in accordance with the approved remediation scheme and that ‘the site is suitable for the permitted end use’.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with Policy DM17 of the Development Management Policies 2015.

(18)        The development hereby permitted shall not commence until the detailed design of the surface water drainage scheme have been submitted to and approved in writing by the planning authority. Those details shall include:

a) A design that satisfies the SuDS Hierarchy and follows the principles set out in the approved drainage strategy ‘Surface Water Strategy, Management and Maintenance Report’

b) Detailed drawings showing drainage layout, long or cross sections of each drainage element, pipe sizes and invert and cover levels.

c) Appropriate calculations to the elements above showing how the national SuDS standards have been met (if different from approved strategy).

d) Details of outline construction phasing and how surface water and any associated pollution risk will be dealt with during the construction of the development, and how any on site drainage systems will be protected and maintained.

e) Details of who will maintain the drainage elements and their associated maintenance regimes.

f) Details of where any exceedance flows (i.e. rainfall greater than design or flows following blockages) would run to, avoiding risks to people and property.

Reason: To prevent an increased risk of flooding and to prevent pollution of the water environment in accordance with Policy CS6 of the Epsom and Ewell Core Strategy (2007) and Policy DM19 of the Development Management Policies 2015.

(19)        Prior to the first occupation of the development, a verification report carried out by a qualified drainage engineer must be submitted to and approved by the Local Planning Authority to demonstrate that the Sustainable Urban Drainage System has been constructed as per the agreed scheme.

Reason: To ensure the Sustainable Drainage System is designed to the technical standards in accordance with Policy CS6 of the Epsom and Ewell Core Strategy (2007) and Policy DM19 of the Development Management Policies 2015.

(20)        Prior to above ground works commencing details of the lighting to the food retail store outside operational hours which should be designed to minimise the risk of light spillage beyond the development site boundary shall be submitted to and approved in writing by the local planning authority and the lighting shall thereafter be operated in accordance with the approved details.

Reason: To safeguard the residential amenity of neighbouring occupiers in accordance with Policy DM10 of the Development Management Policies 2015.

(21)        The food retail store use hereby permitted shall not operate other than between the hours of 08.00- 22.00 hours Mondays to Saturdays (inclusive) and 10.00-17.00 hours on Sundays.

Reason: To safeguard the residential amenity of neighbouring occupiers in accordance with Policy DM10 of the Development Management Policies 2015.

(22)        Prior to the commencement of development, details and samples of the external materials to be used for the development shall be submitted to and approved in writing by the local planning authority.  The development shall be carried out in accordance with the approved details.

Reason: To secure a satisfactory appearance in the interests of the visual amenities and character of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM9 and DM10 of the Development Management Policies 2015.

(23)        Prior to the commencement of development, detailed elevational drawings for the internal courtyard at second and third floor level for the development shall be submitted to and approved in writing by the local planning authority.  The development shall be carried out in accordance with the approved details.

Reason: To secure a satisfactory appearance in the interests of the visual amenities and character of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM9 and DM10 of the Development Management Policies 2015.

Informatives:

(1)            The Council confirms that in assessing this planning application it has worked with the applicant in a positive and proactive way, in line with the requirements of paragraph 186-187 of the National Planning Policy Framework 2012.

(2)            The developer is advised that as part of the detailed design of the highway works required by the above condition(s), the County Highway Authority may require necessary accommodation works to street lights, road signs, road markings, highway drainage, surface covers, street trees, highway verges, highway surfaces, surface edge restraints and any other street furniture/equipment.

(3)            When a temporary access is approved or an access is to be closed as a condition of planning permission an agreement with, or licence issued by, the Highway Authority Local Highways Service will require that the redundant dropped kerb be raised and any verge or footway crossing be reinstated to conform with the existing adjoining surfaces at the developers expense.

(4)            The permission hereby granted shall not be construed as authority to carry out any works on the highway. The applicant is advised that prior approval must be obtained from the Highway Authority before any works are carried out on any footway, footpath, carriageway, or verge to form a vehicle crossover to install dropped kerbs.

www.surreycc.gov.uk/roads-and-transport/road-permits-and-licences/vehicle-crossovers-or-dropped-kerbs

(5)            A pedestrian inter-visibility splay of 2m by 2m shall be provided on each side of the access, the depth measured from the back of the footway and the widths outwards from the edges of the access. No fence, wall or other obstruction to visibility between 0.6m and 2m in height above ground level shall be erected within the area of such splays.

(6)            The permission hereby granted shall not be construed as authority to obstruct the public highway by the erection of scaffolding, hoarding or any other device or apparatus for which a licence must be sought from the Highway Authority Local Highways Service.

(7)            The developer is advised that a standard fee may be charged for input to, and future monitoring of, any Travel Plan.

(8)            Any unilateral undertaking shall be in accordance with Surrey County Council’s standard format.

(9)            The developer would be expected to instruct an independent transportation data collection company to undertake the monitoring survey. This survey should conform to a TRICS Multi-Modal Survey format consistent with the UK Standard for Measuring Travel Plan Impacts as approved by the Highway Authority. To ensure that the survey represents typical travel patterns, the organisation taking ownership of the travel plan will need to agree to being surveyed only within a specified annual quarter period but with no further notice of the precise survey dates. The Developer would be expected to fund the survey validation and data entry costs.

(10)        The water efficiency standard required under condition 10 has been adopted by the local planning authority through the Development Management Policies 2015. This standard is the ‘optional requirement’ detailed in Building Regulations 2010, Part G Approved Document (AD Buildings Regulations (2015), at Appendix A paragraph A1.

The applicant is advised that this standard can be achieved through either:

(a) using the ‘fittings approach’ where water fittings are installed as per the table at 2.1 in the AD or

(b) using the water efficiency calculation methodology detailed in the AD Part G Appendix A.

(11)        This form of development is considered liable for the Community Infrastructure Levy (CIL). CIL is a non-negotiable charge on new developments which involve the creation of 100 square metres or more of gross internal floorspace or involve the creation of a new dwelling, even when this is below 100 square metres. The levy is a standardised, non-negotiable charge expressed as pounds per square metre, and are charged on the net additional floorspace generated by a development.

You will receive more information regarding the CIL in due course.

More information and the charging schedule are available online

http://www.epsom-ewell.gov.uk/residents/planning/planning-advice/community-infrastructure-levy-cil-guidance

(12)        Works related to the construction of the development hereby permitted, including works of demolition or preparation prior to building operations shall not take place other than between the hours of 08.00 to 18.00 hours Mondays to Fridays; 08.00 to 13.00 hours Saturdays; with no work on Saturday afternoons (after 13.00 hours), Sundays, Bank Holidays or Public Holidays.