Agenda item

Ashley House Howell Hill Cheam Road Ewell SM2 7LQ

Demolition of the existing building; erection of a three storey residential development comprising nine flats; provision of ten parking spaces, cycle and refuse storage facilities and new access onto Cheam Road.

Minutes:

Description

Demolition of the existing building; erection of a three storey residential development comprising nine flats; provision of ten parking spaces, cycle and refuse storage facilities and new access onto Cheam Road

Decision

The Committee noted a presentation from the Planning Officer.

The Committee was addressed by Ward Councillor, Christine Howells, who spoke in objection to the Application. The Committee also heard from an objector, and from the Applicant.

The following points were raised by the Committee:

Trees: Members spoke about the number of trees proposed to be planted along the boundary of the site. Members noted that newly planted trees can take a long time to take in the ground, and the possibility of re-planting any which were unsuccessful.

Character of building: Members spoke about the style and character of the proposed development, and noted how it had been well designed.

An additional condition was proposed by the Planning Officer. This condition was that:

(1)          No development shall take place until a detailed scheme of all the semi-mature tree planting along the rear and western flank boundary of the site has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in the first planting season and prior to the first occupation of the development or a phasing to be agreed in writing by the Local Planning Authority. Any trees which, within a period of five years after planting, are removed, die or become seriously damaged or diseased in the opinion of the local planning authority, shall be replaced in the next available planting season with others of similar size, species and number, unless otherwise agreed in writing by the local planning authority. The approved scheme of screen planting shall thereafter be retained.

An additional condition was proposed by Councillor Jan Mason, and seconded by Councillor Steven McCormick. This condition was that:

(2)          The development shall not be occupied until a Car Parking Management Plan setting out provisions for the management and use of the proposed parking has been submitted to and agreed in writing by the Local Planning Authority. These details shall include a scheme for allocated parking and the management of spaces and shall be submitted for approval by the Local Planning Authority and only the approved details shall be implemented and retained as approved unless otherwise agreed.

The Committee resolved with 11 Members voting for, 1 Member voting against, and the Chair not voting that the condition be approved.

Following consideration, the Committee resolved unanimously that:

Planning Permission is GRANTED subject to the following:

Condition(s):

(1)          The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

(2)          The development hereby permitted shall be carried out in accordance with the following approved plans:

AH P2 L PROPOSED SITE PLAN

AH P3 D PROPOSED PLANS

AH P4 C PROPOSED ELEVATIONS

ITB15503-GA-001 B PROPOSED SITE ACCESS ARRANGEMENT

 

Reason: For the avoidance of doubt and to ensure that the development is carried out in accordance with the approved plans to comply with Policy CS5 of the Core Strategy (2007).

(3)          Prior to the commencement of development, details and samples of the external materials to be used for the development shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.

Reason: To secure a satisfactory appearance in the interests of the visual amenities and character of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM9 and DM10 of the Development Management Policies 2015.

(4)          No development shall take place until details of the design, external appearance and decorative finish of all railings, fences, gates, walls, bollards and any other means of enclosure have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details prior to the development first being occupied and shall thereafter be retained.

Reason: To secure a satisfactory appearance in the interests of the visual amenities and character of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM9 and DM10 of the Development Management Policies 2015.

(5)          Prior to commencement of works section drawings through parapets, reveals, soffits, lintel and cills at a scale of 1:5 shall be submitted to the local planning authority. No works shall commence until these specifications are approved and shall carried out in accordance with the approved specifications.

Reason: To secure a satisfactory appearance in the interests of the visual amenities and character of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM9 and DM10 of the Development Management Policies 2015.

(6)          Notwithstanding the approved drawings and prior to the commencement of the development, a drawing to a scale of 1:20 showing the proposed privacy screen along the flank edge of the balconies to Flat 5 and 8, shall be submitted to, and approved in writing by the Local Planning Authority. It is expected that the privacy screen compromise either a wing wall, frosted glazing, perforated metal, or combination of the three, at a height of at least 1.8m and frosted to a minimum of level 3 of the Pilkington Scale. The screen shall be implemented prior to the first use of the balcony, and shall be built in accordance with the approved details and thereafter maintained in situ.

Reason: To protect the amenities and privacy of the occupiers of the adjoining residential properties in accordance with Policy DM10 (Design Requirements for New Developments including House Extensions) of the LDF Development Management Policies Document Adopted October 2015.

(7)          No development shall take place until details of existing and proposed finished site levels, finished floor and ridge levels of the buildings to be erected, and finished external surface levels have been submitted to and approved in writing by the local planning authority. The development shall thereafter be constructed in accordance with the approved details.

Reason: In order to safeguard the amenities of the occupiers of neighbouring properties in accordance with Policy CS5 of the Core Strategy (2007) and Policy DM10 of the Development Management Policies 2015.

(8)          No development shall take place until full details, of both hard and soft landscape proposals, including a schedule of landscape maintenance for a minimum period of 5 years, have been submitted to and approved in writing by the local planning authority. The approved landscape scheme (with the exception of planting, seeding and turfing) shall be implemented prior to the occupation of the development hereby approved and thereafter retained.

Reason: To ensure the provision, establishment and maintenance of an appropriate landscape scheme in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(9)          No demolition, site clearance or building operations shall commence on site until the protective fencing and other protection measures as shown on Drawing Number TPP 01 in the Arboricultural Method Statement dated December 2019 have been installed. At all times until the completion of the development, such fencing and protection measures shall be retained as approved. Within all fenced areas, soil levels shall remain unaltered and the land kept free of vehicles, plant, materials and debris.

Reason: To protect the trees on site which are to be retained in the interests of the visual amenities of the locality in accordance with Policy CS5 of the Core Strategy (2007) and Policies DM5 and DM9 of the Development Management Policies 2015.

(10)       No part of the development shall be first occupied unless and until the proposed vehicular access to Cheam Road has been constructed and provided with a means within the private land of preventing private water from entering the highway, and visibility zones in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority (in general accordance with plan ITB15503-GA-00 Rev B) and thereafter the visibility zones shall be kept permanently clear of any obstruction over 0.6m high.

Reason: in order that the development should not prejudice highway safety nor cause inconvenience to other highway users in compliance with Policy CS16 of the Core Strategy 2007.

(11)       No part of the development shall be first occupied unless and until the highway works, to include the provision of a right turn lane on Cheam Road, have been constructed, generally in accordance with plan ITB15503-GA-00 Rev B.

Reason: in order that the development should not prejudice highway safety nor cause inconvenience to other highway users in compliance with Policy CS16 of the Core Strategy 2007.

(12)       The development hereby approved shall not be first occupied unless and until space has been laid out within the site in accordance with the approved plans for vehicles to be parked and for vehicles to turn so that they may enter and leave the site in forward gear. Thereafter the parking and turning areas shall be retained and maintained for their designated purposes.

Reason: in order that the development should not prejudice highway safety nor cause inconvenience to other highway users in compliance with Policy CS16 of the Core Strategy 2007.

(13)       No development shall commence until a Construction Transport Management Plan, to include details of:

a)            Parking for vehicles of site personnel, operatives and visitors

b)            Loading and unloading of plant and materials

c)            Storage of plant and materials

d)            HGV deliveries and hours of operation

e)            Measures to prevent the deposit of materials on the highway

f)             On-site turning for construction vehicles has been submitted to and approved in writing by the Local Planning Authority. Only the approved details shall be implemented during the construction of the development.

 

Reason: in order that the development should not prejudice highway safety nor cause inconvenience to other highway users in compliance with Policy CS16 of the Core Strategy 2007.

(14)       The development hereby approved shall not be occupied unless and until each of the proposed dwellings are provided with a fast charge socket (current minimum requirements - 7 kw Mode 3 with Type 2 connector - 230v AC 32 Amp single phase dedicated supply) in accordance with a scheme to be submitted and approved in writing by the Local Planning Authority and thereafter retained and maintained to the satisfaction of the Local Planning Authority.

Reason: In recognition of Section 9 “Promoting Sustainable Transport” in the National Planning Policy Framework 2019 and Policy DM36 of the Development Management Policies Document 2015.

(15)       The development hereby approved shall not be first occupied unless and until the facilities for the secure parking of bicycles within the development site have been provided in accordance with the approved plans and thereafter the said approved facilities shall be provided, retained and maintained to the satisfaction of the Local Planning Authority.

Reason: In recognition of Section 9 “Promoting Sustainable Transport” in the National Planning Policy Framework 2019 and Policy DM36 of the Development Management Policies Document 2015.

(16)       No development shall take place until a scheme to enhance the biodiversity interest of the site (including details of bird, bat and insect boxes and swift bricks) has been submitted to and agreed in writing by the local planning authority. The scheme shall be implemented in full prior to the occupation of the development hereby approved and thereafter maintained.

Reason: To enhance biodiversity and nature habitats in accordance with Policy CS3 of the Core Strategy (2007) and Policy DM4 of the Development Management Policies 2015.

(17)       Prior to the commencement of the development, details of sustainability measures shall be submitted to and approved in writing by the local planning authority. These details shall demonstrate how the development would be efficient in the use of energy, water and materials including means of providing the energy requirements of the development from renewable technologies. The development shall be carried out in strict accordance with the approved details prior to the first occupation of the building, shall be maintained as such thereafter and no change shall take place without the prior written consent of the local planning authority.

Reason: To ensure that measures to make the development sustainable and efficient in the use of energy, water and materials are included in the development in accordance with Policy CS6 of the Core Strategy (2007).

(18)       Before any occupation of the development hereby permitted, the upper floors, western flank windows shall be constructed so that no part of the framework less than 1.7m above finished floor level shall be openable. Any part below that level shall be fitted with, and retained in, obscure glazing of a patterned type only, which shall thereafter be retained as such. Obscure glazed windows should be obscured to minimum of level 3 of the Pilkington Scale. The use of any type of film or material affixed to clear glass is not acceptable for the purposes of this Condition.

Reason: To protect the amenities and privacy of the adjoining residential properties in accordance with Policy DM10 of the Development Management Policies Document 2015.

.And the following additional conditions:

(19)       No development shall take place until a detailed scheme of all the semi-mature tree planting along the rear and western flank boundary of the site has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in the first planting season and prior to the first occupation of the development or a phasing to be agreed in writing by the Local Planning Authority. Any trees which, within a period of five years after planting, are removed, die or become seriously damaged or diseased in the opinion of the local planning authority, shall be replaced in the next available planting season with others of similar size, species and number, unless otherwise agreed in writing by the local planning authority. The approved scheme of screen planting shall thereafter be retained.

Reason: In order to safeguard the amenities and privacy of the adjoining residential properties in accordance with Policy DM10 of the Development Management Policies 2015.

(20)       The development shall not be occupied until a Car Parking Management Plan setting out provisions for the management and use of the proposed parking has been submitted to and agreed in writing by the Local Planning Authority. These details shall include a scheme for allocated parking and the management of spaces and shall be submitted for approval by the Local Planning Authority and only the approved details shall be implemented and retained as approved unless otherwise agreed.

Reason: To ensure the efficient and functional use of the car parking area, to safeguard the amenity of future occupiers of the approved development and to ensure that the development does not prejudice highway safety nor cause inconvenience to other highway users in compliance with Policy DM10, DM37 of the Development Management Policies Document 2015 and Policy CS16 of the Core Strategy 2007.

Informative(s):

(1)          The Council confirms that in assessing this planning application it has worked with the applicant in a positive and proactive way, in line with the requirements of paragraph 38 of the National Planning Policy Framework 2019.

(2)          This form of development is considered liable for the Community Infrastructure Levy (CIL). CIL is a non-negotiable charge on new developments which involve the creation of 100 square metres or more of gross internal floorspace or involve the creation of a new dwelling, even when this is below 100 square metres. The levy is a standardised, non-negotiable charge expressed as pounds per square metre, and are charged on the net additional floorspace generated by a development. You will receive more information regarding the CIL in due course. More information and the charging schedule are available online: http://www.epsom-ewell.gov.uk/NR/exeres/74864EB7-F2ED-4928AF5A-72188CBA0E14,frameless.htm?NRMODE=Publishedhttp://www.epsom-ewell.gov.uk/NR/exeres/74864EB7-F2ED-4928AF5A-72188CBA0E14,frameless.htm?NRMODE=Published

(3)          No construction work shall be carried out in such a manner as to be audible at the site boundary before 07:30 hours or after 18:30 hour Monday to Friday; no construction work shall be audible at the site boundary before 8:00 or after 13:00 hours on Saturdays and no construction work of any nature shall be carried out on Sundays or Bank/Public Holidays.

(4)          The permission hereby granted shall not be construed as authority to carry out any works (including Stats connections/diversions required by the development itself or the associated highway works) on the highway or any works that may affect a drainage channel/culvert or water course. The applicant is advised that a permit and, potentially, a Section 278 agreement must be obtained from the Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway. All works (including Stats connections/diversions required by the development itself or the associated highway works) on the highway will require a permit and an application will need to submitted to the County Council's Street Works Team up to 3 months in advance of the intended start date, depending on the scale of the works proposed and the classification of the road. Please see http://www.surreycc.gov.uk/roads-and-transport/road-permits-andlicences/the-traffic-management-permit-scheme. The applicant is also advised that Consent may be required under Section 23 of the Land Drainage Act 1991. Please see http://www.surreycc.gov.uk/people-and-community/emergency-planningand- community-safety/floodingadvice.

(5)          The developer is advised that as part of the detailed design of the highway works required by the above conditions, the County Highway Authority may require necessary accommodation works to street lights, road signs, road markings, highway drainage, surface covers, street trees, highway verges, highway surfaces, surface edge restraints and any other street furniture/equipment

(6)          Section 59 of the Highways Act permits the Highway Authority to charge developers for damage caused by excessive weight and movements of vehicles to and from a site. The Highway Authority will pass on the cost of any excess repairs compared to normal maintenance costs to the applicant/organisation responsible for the damage

(7)          The developer is reminded that it is an offence to allow materials to be carried from the site and deposited on or damage the highway from uncleaned wheels or badly loaded vehicles. The Highway Authority will seek, wherever possible, to recover any expenses incurred in clearing, cleaning or repairing highway surfaces and prosecutes persistent offenders. (Highways Act 1980Sections 131, 148, 149).

(8)          It is the responsibility of the developer to ensure that the electricity supply is sufficient to meet future demands and that any power balancing technology is in place if required. Please refer to: http://www.beama.org.uk/resourceLibrary/beama-guide-to-electricvehicle-infrastructure.html for guidance and further information on charging modes and connector types.

(9)          The applicant should note that under the terms of The Conservation of Habitats and Species Regulations 2010, Wildlife and Countryside Act 1981 and Countryside and Rights of Way Act 2000, it is an offence to disturb nesting birds or roosting bats which are also European Protected Species. You should note that the work hereby granted consent does not override the statutory protection afforded to these and other protected species and you are advised to seek expert advice if you suspect that the demolition would disturb any protected species. Please note that a European Protected Species Licence will be required to allow the proposed development to proceed lawfully. Further details can be found at: https://www.gov.uk/environmental-management/wildlife-habitatconservation

 

Supporting documents: