Cabling Works on the Downs

Meeting: 22/01/2018 - Epsom and Walton Downs Conservators (Item 26)

26 Cabling Works on the Downs pdf icon PDF 58 KB

This report details a proposal from Epsom Downs Racecourse to carry out essential cabling works located in around the area known as Car Park 2 (Owners and Trainers).

Additional documents:

Minutes:

The Conservators received a report presenting a proposal from Epsom Downs Racecourse to carry out cabling works in and around the area known as Car Park 2 (Owners and Trainers).

A revised plan of the proposed route for the cabling was circulated by Simon Durrant at the meeting and replaced the copy included in the original agenda pack. The revised plan highlighted the route of the cabling as a black line.

Simon Durrant informed the Conservators that the proposed works would be undertaken by an experienced contractor who was aware of the need to work sensitively around racehorse training times. Most of the work would be undertaken after 12 noon daily, and banksmen would be in place to warn the workforce of approaching racehorses. It was anticipated that works would take around 2 weeks to complete. Following completion of the works, the ground would be returned to its original condition.

Following consideration, the Conservators:

(1)          Granted approval under byelaw 2. (i) for the necessary cabling works set out in Annexe 1 to the report and the revised plan.